Posted on May 14th, 2019

Commissioned by the national company of the Rhône, IVEA has ensured the reconfiguration and the installation of the new motorization system: 8 electric cylinders for the four locks of Chautagne and Brens, on the Haut-Rhône...

there National company of the Rhône opened in 2010 two locks at Brens, two locks in Chautagne, thus creating a navigable waterway of 50 km on the Haut-Rhône, with the crossing of hydroelectric plants located on these localities.

The 4 identical locks (Freycinet template with 39 m long SAS for 5.2 m wide) make some 1 000 cycles but for use, the electric cylinders operating the doors became defective: buckling and binding of the rods, problems sealing, vibration of gearmotors...

Attesting to its effective response to the CNR's specifications, Ivea has been designated as the market agent! More than the only change in defective material, it has broadened its overall thinking in terms of repositioning and improving the performance of the 8 new Electric Cylinders, to maximize integration, efficiency and reliability.

From surveys to maintenance plans, from design to engineering, factory manufacturing, installation and on-site testing, it is through an integral service that IVEA has been able to adapt to the problem posed. And in doing so, it has also demonstrated that in terms of renovation, the best is not the enemy of the good...


 

 

<i class="icon-arrow_top"></i>